Create a free Feed & Grain account to continue reading

North America invests billions in grain capacity, speed, efficiency

From Mississippi to Quebec, major facilities are under construction — adding millions of bushels of capacity, cutting processing times in half, and strengthening supply chains from farm to export.

Steven Kilger 2 Headshot
Underground industrial facility with storage tanks, conveyor systems, and structural framework
G3 Canada grain terminal
Subscribe to Magazine

Expansion
Delta Grain | grain elevator
Location: Sidon, Mississippi
Planned completion: October 2025
The project will add 2.15 million bushels of new capacity, improving logistical efficiency for farmer delivery processing.

Cargo ship docked at grain elevator facility with loading cranes along industrial waterwayThe Andersons grain terminalExpansion
The Andersons | grain terminal
Location: Port Houston, Texas
Planned completion: Early 2026
New facility aims to increase meal export capacity, strengthen supply chain resilience.

Expansion
Scranton Equity Exchange | grain elevator
Location: Scranton, North Dakota
Planned completion: Unknown
The expansion will boost storage capacity by 50% and slash car loading times in half.

New construction
Bunge | grain facility
Location: Dalhart, Texas
Planned completion: 2026
Project aims to enhance service for West Texas customers, features state-of-the-art handling system.

New construction
United Cooperative | soybean crushing plant
Location: Waupun, Wisconsin
Planned completion: 2026
The plant will crush 7.5 million bushels of soybeans annually and create 50 high-quality jobs.

New construction
Bunge Chevron Ag | renewables oilseed plant 
Location: Destrehan, Louisiana
Planned completion: 2026
The new plant will feature a flexible design, intended to allow the processing of soybeans, as well as softseeds and novel winter oilseed crops.

Underground industrial facility with storage tanks, conveyor systems, and structural frameworkG3 Canada grain terminalNew construction
G3 Canada | grain terminal
Location: Port of Trois-Rivières, Quebec
Planned completion: 2026
The 65,000-metric-tonne facility will feature three high-speed receiving lanes.

New construction
Louis Dreyfus Co. | soybean processing plant
Location: Sandusky, Ohio
Planned completion: Spring 2026
Will have annual soy crushing capacity of 1.5 million metric tons and annual edible soybean oil production capacity of 320,000 metric tons.

Expansion
Incobrasa Industries | soybean processing plant
Location: Gilman, Illinois
Planned completion: 2030
Expansion will help the company more than double its production capacity.

New construction
5V | shuttle train receiver
Location: Dalhart, Texas
Planned completion: 2026
The facility is expected to significantly benefit the Texas Panhandle region by enhancing local feed supply and strengthening agricultural capabilities.

Officials participate in groundbreaking ceremony for Portsmouth Agricultural Intermodal Export Facility with shipping container backdropThe DeLong Co. intermodal export facilityNew construction
The DeLong Co. | intermodal export facility
Location: Portsmouth, Virginia
Planned completion: Early 2026
The facility will offer 15,000 metric tons of storage and handle 15,000-20,000 containers annually.

New construction
Viterra | grain facility
Location: Dalhart, Texas
Planned completion: Mid-2026
The state-of-the-art facility will feature an advanced grain handling system and a loop track served by Union Pacific Railroad.

New construction
Beck's | soybean processing facility
Location: New Madrid, Missouri
Planned completion: Fall 2026
The project will have a processing capacity of 3 million units of soybeans/year.

Expansion
CHS  | grain terminal
Location: Kindred, North Dakota
Planned completion: 2026
Cooperative plans to increase speed and efficiency including a 5.2 million-bushel capacity upgrade.

Expansion
FS GRAIN | grain elevator
Location: St. Anne, Illinois
Planned completion: 2026
The project will add a new state-of-the-art shuttle loader with mainline, Class I rail services provided by Union Pacific and CSX railroads.

Expansion
CHS | grain elevator
Location: Warren, Minnesota 
Planned completion: 2026
The elevator will double its storage capacity and improve receiving and drying speeds to improve the ability to handle corn, soybeans and spring wheat.

Subscribe to Magazine
Page 1 of 42
Next Page